We are a manufacturer established in 1981 specializing in zinc die-casting Hardware items. Our Headquarters setup in Hong Kong the total area 850 sq meter.
In 1987 our factory began to move in Guan Dong of China.
In 1989 the first own factory built the total area 2500 sq meter.
In 1999 our continuous effort to develop the second building area 3600 sq meter established.
To continue improving development and efficiency we provided a wide range of different type of hardware products.
In 2005 we extended our new plant Land area of approximately 50,000 sq meters (production area of approximately 50,000 sq meters Dormitory area of approximately 22,000 sq meter) to ensure provide the excellent quality and best service to all overseas customers continually.

We moved all production line into our new plant the first step area for production line of approximately 32,000 sq meters

Staff facility
Dormitory the first step total area 22,000 sq meter where contains 2500 workers for lodgings. The 2nd step area 10,000 sq meter where contains 1000 workers for lodgings.
Dining hall where contains 1000 workers
Entertainments: Healthy body room, billiards room, library, table tennis room, football and basket field.

| Great Hall | Showroom |
![]() | ![]() |
| Conference room | Training room |
![]() | ![]() |
All newly enters the duty staff to be able to arrange training course such as technology and quality management in a first week.
| Work direction board | Generator and water tank | |
| For staffs work direction and notification. | ||
![]() | ![]() | ![]() |
Standby electric power sets are able to generate 3,000 kilowatts capacities of electricity, providing necessary during central power outage.
The power consumption of entire factory production line, staffs living demanded also reserve to expand to meet the future needs.
Underground water storage tank collected 2000 tons of drinking water prepares it to use.
Permanent member of Hong Kong Die-Casting Association and got the Certificate of Approval ISO 9001:2000 at May 2001.
The major materials Zinc alloy, Stainless Steel, Iron, Aluminum Anodize, Brass or Copper, Wood, Glass, Ceramic, Acrylics for Cabinets Handles, Knobs and Builder Hardware items.
We have over 100 style finish specialize in several of Antique finish and popular finish unable fully recorded.
Inspection section 100% fully checking
Salt spray tester · Profile projector · Heat quench tester ·Thickness tester · Three-Coordinate Measuring Machine
![]() | ![]() |
Temperature stability: Temperature stability of the whole goods must be at least -30 to +80 degrees Celsius. If products are exposed to this temperature range during storage and transportation no negative effect in the surface is allowed.
| Cr (≥0.25 µm) | Ni (≥15.2 µm) | Cu (≥7.6 µm) |
Welcome OEM products and new design coming our highly skilled fully trained and dedicated workforce maintains a flexible attitude on time delivery and focuses on continual improvement in quality and efficiency.
There have 1300-1800 labors from design department to the delivery. Estimation has 80 engineers and QA and QE team about 100 skills workers. We have a perfectly quality control of all products in our factory. Annual production up to 2.4 billion pieces
| Design · Development · Engineering | Molding · Tooling |
![]() | ![]() |
| Die Casting | Stamping |
![]() | ![]() |
Machines from small volume DC-12T up to DC-280T all came from Germany, Italy and Hong Kong. Automatic feeder made in Japan.
| Automatic lathe | Plastics Injection |
![]() | ![]() |
| Secondary process department | Polishing Department | |
![]() | ![]() | ![]() |
The tolerance up to ±0.03 with high polishing surface and complicated pattern can be made.
We supply products to different country in USA, Europe and Asia.
| Automatically Electroplating · PVD treatment · Powder Coating · lacquering production line | ||
![]() | ![]() | ![]() |
| Assembling · Packing Finished goods inspection and packaging there are totally 12 assembly lines and will extend to 32 Lines total 1000 worker | |
![]() | ![]() |
| Transportation May simultaneously hold in 6 containers for cargo loading |
![]() |
Mission
Our mission is to become our customers most valued supplier and maintain that status.
We will send our updated catalogues, which included full range of our products. Welcome order samples free of charge it takes 1 week delivery. New tooling sample leadtime around 14 days to 40 days. Normally goods delivery needs 30-35 days.
We replan to cut down the leadtime to 14 days to 21 days about in coming soon
Should you require actual samples and further information please don't hesitate to contact us.
We hopefully can establish the mutual business and make close relationship in the near future.
Yours faithfully,
Amy Yip
Merchandising Manager
Links associate with this page: General Metal Parts Suppliers - Knobs Suppliers - Hinge & Hook Builder's Hardware Suppliers - Bathroom Accessories Suppliers - Hook Suppliers
Home - Products - Suppliers - Selling Leads - Buying Leads - Registration | Success Stories - Procurement Meetings | Site Map
About Tradeeasy - Contact Us | Buyer Services - Seller Services | Business Links - Link to us | Privacy Policy - Terms of Use
©1997-2008 Tradeeasy.com. All rights reserved.