PP-C Pipe - Heating System Joint Method

PP-C Pipe - Heating System Joint Method
Item Code / Model Number:

PP-C Pipe - Heating System Joint Method PP-C Pipe - Heating System Joint Method
How to Process the Floor Heating System
  1. Confirm the floor is horizontal:
    • In case of not even have to correct evenly.
  2. Install clip bar:
    • Principally within 2m between the clip bars but it doesn't matter to install about 1.5m.
    • Fix upon driving nails on both ends of clip bars.
  3. Carry out work as the drawing after untied the pipe:
    • In case of pipe laying the dia.12, possible of forced pipe laying, but have to use bending machine for the dia.15 and should operate osftness at the time of banding.
  4. Jointing operation:
    • It is necessary to cut the pipe not too short, and it will be efficient to operate the valve and valve socket should be fastened in advance.
  5. As a confirming operation of leaking spot prior to the mortar application it is necessary to confirm after installing the hydraulic pressurer at the socket of the air valve of the hot water distributer.
  6. Mortar Operation
    • The most ideal thickness from floor is 50mm.

  7. Second Hydraulic Test
    • Have to confirm final and generally after finishing mortar operation.
  • Keywords:
  • builder's hardware, general, plastic pipe & fitting, construction

Company Profile

  • Business Type:
  • Manufacturer
  • Country:
  • Hong Kong (China)

Contact Information

  • Company Name:
  • Ample Life
  • Country:
  • Hong Kong (China)
  • Address:
  • Rm1506, 15/F.,
    Singga Commercial Centre,
    148 Connaught Road West,
    H.K.
  • Website:
  • http://www.ample-pipe.com.hk

©1997- Tradeeasy.com. All rights reserved.