Recommended Suppliers
Gracemate Limited
  • Dress, GMDR 036

    100% Polyester Fabric and Garment Lead Time 1) Fabric lead time depends on which kind of fabric, normal 30 ~ 60 days. 2) Garment lead time 45 ...

  • Long Coat, GMJK 040

    100% Polyester Fabric and Garment Lead Time 1) Fabric lead time depends on which kind of fabric, normal 30 ~ 60 days. 2) Garment lead time 45 ...

  • Suit, GMJK 027

    100% Polyester Fabric and Garment Lead Time 1) Fabric lead time depends on which kind of fabric, normal 30 ~ 60 days. 2) Garment lead time 45 ...

  • Blazer, GMJK 018

    67% Triaceta 33% Poly Fabric and Garment Lead Time 1) Fabric lead time depends on which kind of fabric, normal 30 ~ 60 days. 2) Garment lead time ...

  • Suit, GMJK 020

    50% Silk 50% Wool Fabric and Garment Lead Time 1) Fabric lead time depends on which kind of fabric, normal 30 ~ 60 days. 2) Garment lead time 45 ...

item(s) selected
Contact Now

Result Page: 1

Showing Results 1 - 5 of 5, total 1 pages

Company Profile

  • Business Type:
  • Manufacturer
  • Country:
  • Hong Kong (China)
  • Principal Customers:
  • Calvin Klein, Oleg Cassini
  • OEM:
  • YES
  • ODM:
  • NO
  • Existing Markets:
  • USA
  • Factory Location:
  • Hubei, China
  • Factory Audited By:
  • Calvin Klein
  • OPA:
  • NO
  • Production Leadtime:
  • 90 days
  • Offshore C/O:
  • NO
  • CMT:
  • YES
  • Monthly Productivity:
  • 70,000 pcs
  • VAT:
  • NO
  • Certificates:
  • ISO 9001
  • Strengths:
    1. Competitive price
    2. Own design team
    3. High & stable quality

Contact Information

  • Company Name:
  • Gracemate Limited
  • Country:
  • Hong Kong (China)
  • Address:
  • Flat A, 15/F., Bold Win Industrial Building, 16-18 Wah Sing Street, Kwai Chung, N.T. Hong Kong

©1997- Tradeeasy.com. All rights reserved.